Wind turbine simulation for connected single phase
Abstract
This research project presents about wind turbine simulation for connected single phase grid system using hysteresis current control technique to generate PWM signals for controlling a single-phase voltage source inverter. The simulation system presented here uses the program. MATLAB/Simulink in the simulation of the wind turbine connected to the shaft of a three-phase permanent magnet generator is
produced by alternating current through the full bridge rectifier circuit. Then, the power supply is applied to the single-phase inverter circuit, which is connected to the single-phase autotransformer to power transfer to the single-phase grid system. The simulation results confirm the validity of the proposed system with satisfaction under various conditions.
Collections
- Research Report [286]