Show simple item record

dc.contributor.authorHiabsuwan, Chalermponen_US
dc.contributor.authorเฉลิมพล เฮียบสุวรรณen_US
dc.date.accessioned2016-09-08T08:39:02Z
dc.date.available2016-09-08T08:39:02Z
dc.date.issued2016-09-08
dc.identifier.urihttp://repository.rmutp.ac.th/handle/123456789/2032
dc.descriptionการค้นคว้าอิสระ (วศ.ม.) -- มหาวิทยาลัยเทคโนโลยีราชมงคลพระนคร, 2557en_US
dc.description.abstractThis research aimed to establish the power transformer fault management system by applying Sustainable Industrial Management Engineering (SIME.) method. The research tools were electrical and chemical testing. As power transformer is usually huge, when it is damaged the possible way to manage such damage is to send such power transformer to the manufacturer’s plant for repair which requires long period of time and high costs of repair. As a result, the researcher therefore establish the power transformer fault management system as a tool for assessing damage to decide whether power transformer repair should be instead done at the power station or not in order to decrease the number of power transformer returned to the manufacturing plant for repair. This would eventually help reduce costs and time for repairing power transformer and allows faster period of reuse of power transformer concomitantly. According to the result, it would found that the power transformer fault management system by applying Sustainable Industrial Management Engineering (SIME) method could be used as guidance for decision making to have power transformers repaired at the power station as much as possible. This could help reduce average time spent for repair by 84.44 percent with the cost reduction by 68.62 percent when comparing to returning power transformers to the manufacturing plant. This could also be applied in planning for power transformer maintenance prior to the occurrence of any damage to power transformers further.en_US
dc.description.sponsorshipRajamanagla University of Technology PhraNakhonen_US
dc.language.isothen_US
dc.subjectmanagement engineeringen_US
dc.subjectTransformeren_US
dc.subjectPower Transformer (MVA)en_US
dc.subjectวิศวกรรมการจัดการen_US
dc.subjectหม้อแปลงไฟฟ้าen_US
dc.subjectหม้อแปลงไฟฟ้า (MVA)en_US
dc.titleEstablishment of power transformer fault management by sustainable industrial management engineering (SIME.) case study tirathai public company limiteden_US
dc.title.alternativeการสร้างระบบการจัดการความเสียหายหม้อแปลงไฟฟ้ากำลังด้วยวิธีการจัดการอุตสาหกรรมอย่างยั่งยืน กรณีศึกษา บริษัท ถิรไทย จำกัด (มหาชน)en_US
dc.typeIndependent Studyen_US
dc.contributor.emailauthorarit@rmutp.ac.then_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record