dc.description.abstract | The objectives of this research are to develop the structure, to create the knowledge of construction technology, to test the properties, to construction the prototype building, and to transfer the technology of hemisphere pre-engineered building with easy assembly steel structure type. The load and resistance factor design (LRFD) method was used to design the structure by regarding the strength, material type, construction and deconstruction step, and cost. From the design, the prototype of
hemisphere pre-engineered building (only the frame structure) was construction with 5 meters of diameter, 3.5 meters of height, 19.635 square meters of useful space, 200,000 Baht of material cost (10,186 Baht per square meter for all materials), 27 hours or 3 days of construction period. According to the modular coordination system, this hemisphere pre-engineered building cans construction and deconstruction fast, especially when apply to help disaster victims. After tested the structure that the calculation value of safety factor (S.F.) is 1.76. The envelope of this building used the ratio of Portland
cement type 1: fine sand: coconut fiber: waterproofed liquid: tap water which equal to 1:3: 0.1: 0.02: 0.5 by weight and reinforced by round bar and wire mesh steel. According to the testing, the building-envelope properties are following: density 1,582 kg/m3, thermal conductivity coefficient 0 .3 7 1 watt/m.Kelvin, water absorption 1 7 .3 1 %, compressive strength 118.47 ksc, and bending strength 28.88 ksc. Moreover, these results can register the copyright and draft the research paper to transfer the technology for target group. | en_US |