dc.description.abstractThis paper aim to be improvement the installation methods for Sliding Aluminium Door and Glass in order to be the good quality product by applying the motion and time study, design the new model of the receiver lock set for the sliding door. The step of study process started from studied the sliding door installation processes, gathering the works process and reducing unnecessary and duplicate of work process on site elimination, establishing standardized time for modifying the installation process. From the result before applied new method we founded that the installation process before installation process improvement, we were spent the time of installation process at 45.38 minute per set and after we used the new method we founded that the installation process time was 35.36 minute per set, it can be decreased the installation time was 10.02 minute and the efficiency of work process operation was increased 22.08 percent and the line balancing performance before improvement was 56.73 percent and after improvement was 88.40 percent and the line balancing performance was increased 31.67 percent. Unless there are the improvement installation methods, it makes the company in case study will be do the work to be delay and cannot be hand over the works just in time by the schedule planning.en_US
dc.description.sponsorshipRajamangala University of Technology Phra Nakhonen_US
dc.language.isothen_US
dc.subjectAluminiumen_US
dc.subjectอะลูมิเนียมen_US
dc.subjectGlassen_US
dc.subjectกระจกen_US
dc.subjectSliding door aluminium and glassen_US
dc.subjectประตูบานเลื่อนอลูมิเนียมและกระจกen_US
dc.titleSliding aluminium doors and glass installation improvement using motion and time study techniques : A case study in glass line company limiteden_US
dc.title.alternativeการปรับปรุงการติดตั้งงานประตูบานเลื่อนอลูมิเนียมและกระจก ด้วยเทคนิคการศึกษาการเคลื่อนไหวและเวลา กรณีศึกษา บริษัท กลาสไลน์ จำกัดen_US
dc.typeIndependent Studyen_US