Show simple item record

dc.contributor.authorPussawiro, Sirawiten_US
dc.contributor.authorศิรวิทย์ ปุสวิโรen_US
dc.contributor.authorVorarat, Suparatchaien_US
dc.contributor.authorศุภรัชชัย วรรัตน์en_US
dc.date.accessioned2023-03-29T07:34:30Z
dc.date.available2023-03-29T07:34:30Z
dc.date.issued2023-03-29
dc.identifier.issn2651-1096
dc.identifier.urihttp://repository.rmutp.ac.th/handle/123456789/4025
dc.descriptionวารสารวิชาการและวิจัย มทร.พระนคร, ปีที่ 16, ฉบับที่ 1 (ม.ค.-มิ.ย 2565), หน้า 149-164en_US
dc.description.abstractThis research objective is to improve the overall equipment effectiveness of the water filtration systems in the case study of the Water Treatment Plant, which divides the water production into 4 production lines. The water filtration system has an electric actuator and gear, is the main machine in the water filtration system. An electric actuator and gear have more machine breakdowns. That makes the water filtration system is the bottleneck of the water production process. This research study is divided into two steps: the first step is the presentation of the equation and the steps to measure the Overall Equipment Effectiveness of the water filtration system. The equation used data from the computer maintenance management system to analysis on mean time between failure data (MTBF), mean time to repair data (MTTR) and water production process data. The results can be improved the overall equipment effectiveness of the water filtration system increased to 0.11%, 0.68%, 0.44% and 2.44%, respectively in each production process line. And increased Quantity of Filtration Water increased to 328,500 m3/year, 1,168,000 m3/year, 1,022,000 m3/year and 3,832,500 m3/year, respectively in each production process line. In this research used the pillar of focus improvement. By adding a protection system to prevent machine breakdown, because of the most of the problems are found that the protection system malfunctions. This is the most problem in the 4th And then used engineering knowledge to improve water production and the success factor are required a human resources of all parties to cooperate, brainstorm and analyze the causes of various losses in order to eliminate them.en_US
dc.description.sponsorshipRajamangala University of Technology Phra Nakhonen_US
dc.subjectMachineryen_US
dc.subjectเครื่องจักรกลen_US
dc.subjectTap wateren_US
dc.subjectน้ำประปาen_US
dc.subjectFactoriesen_US
dc.subjectโรงงานen_US
dc.subjectMaintenanceen_US
dc.subjectการบำรุงรักษาen_US
dc.titleThe overall equipment effectiveness improvement of the water filtration systems in the large water treatment plant by total productive maintenance evaluation: a case study of the water treatment planten_US
dc.title.alternativeการปรับปรุงประสิทธิผลโดยรวมของเครื่องจักร ของระบบการกรองน้ำของโรงงานผลิตน้ำขนาดใหญ่ โดยใช้การบำรุงรักษาทวีผลโดยทุกคนมีส่วนร่วม : กรณีศึกษาโรงงานผลิตน้ำประปาแห่งหนึ่งen_US
dc.typeJournal Articlesen_US
dc.contributor.emailauthorsirawit78956@gmail.comen_US
dc.contributor.emailauthorarit@rmutp.ac.then_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record